A Sellafield based Nuclear Reactor
can generate all of the electricity [domestic; commercial; industrial] used by a population of 942,424 people for 60 years. That's more than what is required for the Cities of Lancaster, Preston and Liverpool.
Population Supplied: 930,277
can generate all of the electricity [domestic; commercial; industrial] used by a population of 942,424 people for 60 years. That's more than what is required for the Cities of Lancaster, Preston and Liverpool.
Population Supplied: 930,277
--------------------//--------------------
6 Offshore Wind Farms
Off the North West Coast of England are :
West of Duddon Sands; Walney; Robin Rigg; Ormonde; Barrow; Burbo Bank.
4C Offshore
Off the North West Coast of England are :
West of Duddon Sands; Walney; Robin Rigg; Ormonde; Barrow; Burbo Bank.
4C Offshore
A total of 363 x 3.47 MW [average] turbines occupy 188 sq km, have an Installed Capacity of 1,260 MW, have an Average Lifespan of 22.5 years and cost £3,655 million
[£2.9 million/MW Installed]
[£2.9 million/MW Installed]
'Homes powered annually': 762,507.
BEIS figure: 3,994 kWh/home per year.
So - Electricity generated per hour: 347,654,447 W
@594 W/person
Population Supplied: 585,277
--------------------//--------------------
To supply 930,277 would:
Require 577 x 3.47 MW Turbines
Occupy an Area of 299 sq km
--------------------//--------------------
Have an Installed Capacity of 2,002 MW
Cost £5,806 million
--------------------//--------------------
To supply for 60 years, all of this Offshore Wind Farm Capacity has to be built a 2nd Time and then Generate for 2/3 of the life of the 3rd Build - That's a factor of X2.66' !
That would cost: £15,487 million.
[The output from 1,539 x 3.47 MW turbines]
--------------------//--------------------
The most expensive form of Pressurised Water Reactor, the the 3,200 MW EPR at Hinkley Point, has a capital cost of £18 Billion + a 'delayed' cost of £7.2 billion for decommissioning and waste handling and storage. That works out at £7,875 million/MW.
--------------------//--------------------
At the same rate in £/MW for capital cost, decommissioning, waste handling and storage, a 620 MW SMR would cost: £4,883 million.
Offshore Wind Turbines cost 3.17X more than SMRs !
-----------------------------//-----------------------------
Population Supplied: 585,277
--------------------//--------------------
To supply 930,277 would:
Require 577 x 3.47 MW Turbines
Occupy an Area of 299 sq km
--------------------//--------------------
Have an Installed Capacity of 2,002 MW
Cost £5,806 million
--------------------//--------------------
That would cost: £15,487 million.
[The output from 1,539 x 3.47 MW turbines]
--------------------//--------------------
The most expensive form of Pressurised Water Reactor, the the 3,200 MW EPR at Hinkley Point, has a capital cost of £18 Billion + a 'delayed' cost of £7.2 billion for decommissioning and waste handling and storage. That works out at £7,875 million/MW.
--------------------//--------------------
At the same rate in £/MW for capital cost, decommissioning, waste handling and storage, a 620 MW SMR would cost: £4,883 million.
Offshore Wind Turbines cost 3.17X more than SMRs !
-----------------------------//-----------------------------